Energy-efficient retrofitting

Administration building

Energy-efficient retrofitting

Administration building

During the energy-efficient retrofitting of an administration building with a gross floor area of 23,000 m²,  DIAG TGA replaced the complete building air-conditioning system. The task was to adapt the air distribution system and the central air-conditioning system including releated auxiliary equipment to the latest hygiene standards and to optimize energy consumption. All works were performed with the building in full use.

 

Key aspects/services

  • Energetic analysis
  • Reporting acc. to DIN SPEC 15240 as verification acc. to §11 EnEV (German Energy Saving Ordinance)
  • Technical concept for the technical building services modernization
  • Supply, installation and commissioning

further projects

  • Food industry
  • Metalworking
  • Particle accelerator
  • Laboratory
  • Analytical laboratory
  • Aluminium casting plant
  • Shopping mall
  • Automobile manufacturer
  • Oil shale-fired thermal power plant
  • Experimental reactor decommissioning
  • Gas transmission station
  • Customized plant designs and fans
  • Reproduction of components
  • Mobile refrigerating plants
   
>75
over seventy-five years of experience
100
more than a hundred employees
800
more than eight hundred projects worldwide